Approach
Tech International, a branch of TRC Technical Rubber Company, consolidated several separate production facilities into a unified and modernized industrial campus in Johnstown, OH. The renovation focused on an existing 20,000 SF, while the addition added 62,000 SF to an existing 90,000 SF footprint. This expansive addition enables more efficient operations while eliminating the need to transport materials between disjointed buildings. Special attention was given to high-hazard areas associated with rubber vulcanization and chemical use, which required explosion-resistant construction, fire separation walls, and staged failure systems, such as relief panels and pressure-rated doors. A third-party hazard assessment informed the sizing for blast relief panels and placement of two 30-foot-tall reinforced double 12” CMU grouted solid walls to resist and direct explosive force safely.
Additional infrastructure, like containment dykes and special floor slab construction, are included to prevent chemical leaks. The tanker off-loading area features a covered, spill-controlled bay for the unloading of tractor-trailers, further enhancing operational safety. Meanwhile, design elements include numerous windows providing natural lighting in both office and production spaces, a bold red feature staircase, and acoustic panels to support both openness and productivity. Amenities like printing, electrical and compressor rooms, as well as testing labs, and a maintenance bay allow for in-house ease and functionality, while a brand new office with a historical exhibit helps connect employees to the company’s roots, reinforcing purpose and community ties, and additionally unifies the space, creating a cohesive campus for Tech International.
-
Jaclyn RantonInterior Designer
-
Mike JacobsohnSr. Project Manager
-
Kurt BeresPrincipal, Studio Lead - Technical Services